Driveways
Driveways that hold up.
Block paving, gravel, resin-bound and tarmac driveways — engineered base, proper drainage, no movement.
Engineered base
Excavate, MOT Type 1 sub-base, compaction. The bit that lasts.
Proper drainage
Falls, channel drains and soakaways planned at the start.
Edge restraint
Concrete-haunched kerbs so the driveway does not creep.
All finishes
Block paving, gravel, resin-bound, tarmac. Matched to the house.
Fixed quotes
One number on the page. No add-ons mid-build.
What goes underneath
The half nobody sees.
Most failed driveways fail at the base. We over-spec the sub-base, compact in layers, and edge-restrain every metre.
Driveway restoration · Carlingford How we work
A clear path from quote to handover.
Step 01
Site visit
We walk the drive, take levels, and check ground.
Step 02
Quote
Spec, finish, drainage, schedule and fixed price.
Step 03
Build
Strip, sub-base, finish, edge restraint, drainage. Done in one push.
Step 04
Hand over
Walk-through, care guide, workmanship guarantee.
FAQ
Common questions.
Most driveways run one to three weeks. Larger or wet sites can take longer. You get a calendar with the quote.
Block for traditional houses and the longest life. Resin-bound for clean modern lines, fast install, and easy maintenance. Both work — we will recommend based on the house.
Not if it is built properly. We over-spec the sub-base and compact in layers. Most failures are skipped sub-base — we do not skip it.
€2.6m public liability cover. Registered as Cutting Edge Design Limited (Company #762819).