Hardscaping
Stone that stays put.
Hand-laid patios and decking — engineered structurally, finished by hand, built to last decades.
Engineered base
Compacted sub-base on every patio. Done properly the first time.
Hand-cut joints
Every joint cut on site. No factory grout lines.
Real materials
Sandstone, granite, porcelain, hardwood, composite — chosen for the brief.
Drainage planned
Falls, gullies and soakaways designed in, not bolted on.
Fixed quotes
The number we send is the number you pay.
Patios
Patios laid to last decades.
Indian sandstone, Mourne granite, large-format porcelain. Sub-base, drainage, and a fall that actually works.
Natural stone retaining wall · Omeath How we work
A clear path from quote to handover.
Step 01
Site visit
We walk the site, take levels, and check ground conditions.
Step 02
Quote
A clear, fixed price with materials, sub-base spec and a calendar.
Step 03
Build
Strip, sub-base, lay, point, finish — by our crew on our schedule.
Step 04
Hand over
Walk-through, care guide, and we are still on the phone after.
FAQ
Common questions.
Most patios run two to six weeks depending on size and access. We give you a calendar with the quote.
Sandstone for warmth and softness underfoot, granite for the longest life, porcelain for clean modern lines and easy maintenance. We will recommend based on your house, budget and use.
Composite for low maintenance and a 25-year life. Hardwood for the look and the patina. We do both — we do not sell against either.
Yes. Workmanship guarantee on every build. Sub-base spec is BS 7533 on every hard-landscape project.